office@dgccapital.com
Call us (914) 664-7244
Mt Vernon, NY

FAO Schwarz

In September of 2018, DGC Capital Contracting was tasked with receiving, assembling and installing 11 Shipping containers coming into the Port of Newark for the new FAO Schwarz in Rockefeller Center. The project needed to be completed before for the Nov 16th opening, and the tree lighting. This scope included building the three story clock tower, installing the famous floor piano,and building a two story rocket ship. After that, we had to install every other design element from floor to ceiling.

LOCATION:

Manhattan, New York City

YEAR:

2018

SIZE:

20,000 SQFT